Solar Report Card 2020

Solar Report Card 2020

We installed a 28kW solar panel system in October 2015.  The system was designed to generate 98% of our energy needs to operate the winery, tasting room and case storage facility.  It continues to exceed our expectations.  As the bar chart shows, we have generated...

Silver Thread is Going Solar

July 20, 2015–Today, Silver Thread Vineyard broke ground on a 28 kilowatt solar panel system that is expected to provide 100% of the winery’s energy needs.  The system will be installed by Qwik Solar of Geneva, NY, and should be operational in time for...